Projects

Welcome to the “Projects” page of my website. The work listed on this page represents an overview of experience by project type. It is not a complete list but will give you a sense of my varied practice as an Architect. Selected projects have a link to an image or to a full project profile. To go back to my visual portfolio go home.

Categories (scroll down or click a heading to jump):

Commercial – Mixed Use

  •  The New City; Chicago, Illinois.
    • Multi-building retail/mixed-use project with residential tower component, seven level parking garage and central plaza.
    • Role: Project manager for various portions of the project during the Design Development and Construction Document phases. Completed the architectural specifications for the project (with LEED provisions).
    • Click here for a full profile of this project . . .
  • DeKalb Mixed-Use; DeKalb, Illinois.
    • Multi-building, six to seven story, mixed-use project including retail and housing adjacent to downtown DeKalb.
    • Role: Project Manager during the pre-design and planning phases of the project (project did not proceed beyond planning).
    • Click here for an image from this project . . .
  • Main and Osage Mixed-Use, Normal, Illinois.
    • Five story mixed-use project with ground level retail and four levels of condominium apartments.
    • Role: Specification writer; completed the architectural portions, coordinated consultants specifications and provided technical assistance to the Project Manager during the end of the Construction Documents Phase.
  • 500 West Monroe Street; Chicago, Illinois.
    • 45 story office tower with lobby retail space and twelve floors of parking.
    • Role: Design / technical assistance during design development and construction document phases; involved with detailing of the curtain wall system (skin) of the building.
    • Click here for a full profile of this project . . .
  • NorthBridge Plan – see Site | Planning | Development category (below).
  • The Wrigley Building – see Preservation | Restoration | Refurbishment category (below).
  • Yondorf Block – see Preservation | Restoration | Refurbishment category (below).

Commercial – Office | Banking

  • Radiological Society of North America; Oak Brook, Illinois.
    • Build-out of 22,000 square feet of meeting rooms and offices space (plus the renovation of the ground level fitness center) utilizing Owner’s design standards.
    • Role: Project Management of the construction operations (Architect: EWP).
    • Click here for a full profile of this project . . .
  • Branch Banks – Comerica Bank; Woodstock & Glenview, Illinois.
  • Affiliated Bank; Skokie (Skokie/Dempster Facility).
  • Office/Suite Renovation(s): Chicago Region
    • Design and renovation of a number of small office spaces of varying size and complexity, from under 2,000 to over 10,000 square feet.
    • Role: Project Manager, directed all phases of the projects – design through construction.
      • Pepper Construction, Tinley Park Office
      • Gruntal Investment House, 2 First National Bank
      • Affiliated Bank Office Space, North Avenue
      • Affiliated Bank Office Space, Oak Brook
      • Comerica Bank Office Space, 203 LaSalle Street (3rd floor)
      • Comerica Bank Office Space, 203 LaSalle Street (26th floor)

Retail | Entertainment | Hospitality

  • Autograph Hotel; Chicago, Illinois
    • New mid-rise, concrete frame, boutique hotel, restaurant and meeting spaces (21 story, 195 rooms) in Chicago’s Streeterville area.
    • Role: Technical assistance to the design team and various construction administration tasks.
    • Click here for an image from this project . . .
  • Firehouse Falls, Indoor Water Park; Bridgeview, Illinois.
    • 90,000 s.f. ($60 million) indoor water park and family entertainment center as part of a mixed-use development at the Bridgeview Soccer Complex.
    • Role: Project Manager/Project Architect from Schematic Design through Foundation Permit Drawings (project canceled and never completed).
    • Click here for an image from this project . . .
  • DoubleTree Hotel; Chicago, Illinois
    • Complete renovation of former Holiday Inn on Chicago’s gold coast. Project focusing on drop-off area, lobby, restaurants and public spaces.
    • Role: Project Manager during the design phases.
    • Click here for an image from this project . . .
  • Woodstock Opera House – see Preservation | Restoration category (below).
  • The Right Start Store: various locations (over 25 stores).
    • Design refinement/roll-out for a new 2,500 square foot children’s specialty retail store.
    • Role: Project Manager; directed the projects; refined the initial design and managed the roll-out program for the client from project scheduling through construction support.
    • Click here for a full profile of this project . . .
  •  Contempo Casuals: various locations (over 10 stores).
    • Design refinement/roll-out program for 4,000 – 8,000 square foot specialty retail store .
    • Role: Project Manager; directed the projects; refined the initial design to meet budget requirements and managed the roll-out program for the client.
  • Tensuke Market Sushi Bar: Elk Grove Village, Illinois.
    • Renovation and upgrades to a sushi bar in a Japanese grocery store including prep and serving areas.
    • Role: Project Manager; directed all phases of the project.
  • Brothers Gourmet Coffee Bars: various locations.
    • Design development and Construction Documents for 2,000-3,000 square foot coffee houses.
    • Role: Project Manager; directed all phases of the projects.
  • Miscellaneous Retail and Food Service projects in the Chicago area.
    • Role: Contributed to the projects; design and drafting tasks, specification, client interaction and construction support; some project management. Selected projects include:
      • Marshall Field’s, various departments, Chicago area.
      • Brookstone Store, various locations, US.
      • The Patisserie, food court outlet, Mount Prospect, Illinois.
      • Stride-Rite Shoe Stores, three locations, Chicago area.

Schools | Libraries | Civic | Public

  • CHA – Altgeld Gardens – Library / Childcare / Community Spaces; Chicago, Illinois
    • 40,000 S.F. / 1-story, $16 million, LEED Gold, mixed-use building housing a branch of the Chicago Public Library (CPL), a licensed day care center for over 150 kids and multi-purpose community spaces for both Library and community use at Altgeld Gardens Homes, a historic Chicago Housing Authority (CHA) project (project ongoing).
    • Role: Project Manager; directed the project from conception to the completion of construction.
    • Click here for an image from this project . . . (coming soon)
  • CHA – Gautreaux Center (Chicago Youth Centers) Childcare Center; Chicago, Illinois
    • 10,000 S.F. / 1-story, renovation of an existing childcare facility. In addition to general building renovation (both inside and out), the program is being expanded to add school-age activities to the existing 2 to 5 year daycare program (project ongoing).
    • Role: Project Manager; directed the project from conception to the completion of construction.
    • Click here for an image from this project . . . (coming soon)
  • Cook County – Child Advocacy Centers; Chicago & Rolling Meadows, Illinois
    • Build-out of existing space at two Cook County courthouses into childcare / drop-off facilities for children of parents making court appearances. The Chicago facility can accommodate ages 2 to 16 and the Rolling Meadows facility can accommodate ages 6 months to 16.
    • Role: Project Manager; directed the project from end of the construction document phase to the completion of construction.
    • Click here for an image of these project . . .
  • GSA – Custom House Child Care Center; Chicago, Illinois
    • Complete renovation of an existing, 8,500 S.F. licensed daycare center.
    • Role: Project Manager; directed the project during the construction phase.
    • Click here for an image of this project . . . (coming soon)
  • PBC/CPS – Walter Payton College Preparatory High School Annex; Chicago, Illinois.
    • 49,000 S.F. / 3-story, $20 million school addition. Firm served as Architect of Record for this LEED project. Program included: classrooms, gymnasium, cafe / lounge space, black box theater, some renovation in the existing school including a new science lab and site work.
      • Chicago Building Congress (CBC), 2017, merit award winner for buildings under $55 million.
      • Vestibule / Generator Project – Separate and concurrent CPS project ($300,000).
      • New Parking Lot Project – Separate and concurrent CPS Project ($1,000,000).
    • Role: Project Manager; directed the project from construction document phase to the completion of construction.
    • Click here for a full profile of this project . . .
  • PBC/CPS – 2013 School Improvement Program (SIP); Chicago, Illinois
    • Renovation, refurbishment and repair work including: masonry repair, roof work, interior finishes, selected MEPFP and kitchen work, some classroom reconfiguration / new program spaces (computer lab, media lab, engineering lab, science room) to four schools as part of the 2013 program (John P. Atlgeld [now Wentworth], Clara Barton, Scott Joplin & Fort Dearborn Elementary Schools). Total construction budget of about $8 million.
    • Role: Project Manager for the Design Architect during the Design, Procurement and Construction Phase; worked in tandem with the PBC Project Manager to insure that the work of the AOR/Design-Build team met the scope and quality requirements of the CPS program. Same role during the close-out phase but for 24 schools.
  • PBC/CPS – Edgebrook Elementary School; Chicago, Illinois.
    • 34,000 S.F. / 2-story, $10 million, school addition. Firm served as Architect of Record for this LEED Silver project. Program included: eight classrooms, computer lab, science lab, offices and full cafeteria suite. There was also extensive site work, new playground and green roof.
    • Role: Project Manager; directed the project from transfer package to completion of construction documents.
    • Click here for a full profile from this project . . .
  • CPS – Buckingham School; Chicago, Illinois.
    • Masonry repair, roof work, window replacement, some interior finish work, some MEP work and other minor repairs to a small neighborhood special needs elementary school.
    • Role: Project Manager; directed the project from start to finish.
  • CPS – Smyth School; Chicago, Illinois.
    • Masonry repair, roof work, cornice/parapet restoration, window replacement, some MEP work and other minor repairs to a large neighborhood elementary school.
    • Role: Project Manager; directed the project from start to finish.
  • Mount Horeb Area Historical Society – Driftless Historium; Mount Horeb, Wisconsin.
    • 15,000 S.F. / 2-story, $1.5 million local history museum. The project included the renovation of an existing 5,000 S.F. museum and 10,000 S.F. of new construction. The program included: lobby/gift shop, permanent exhibit area, temporary exhibit area, programming / large meeting, research / meeting room, receiving / work area, archive and artifact storage, administrative and support spaces.
    • Role: Architectural design services and project guidance to the building committee.
    • Click here for a full profile of this project . . .
  • Woodstock Opera House – see Preservation | Restoration category (below).
  • Elks Memorial – see Preservation | Restoration category (below).
  • Lawrence Hall Youth Services; Chicago, Illinois.
    • Phased new campus and headquarters facility including dormitory style housing, school and administrative offices for Lawrence Hall.
    • Role: Technical support to the design team for various portions of the project.
    • Click here for an image from this project . . .
  • Chicago Public Library (CPL) – Altgeld Gardens Branch – see CHA Altgeld Gardens Project (above).
  • Benton Harbor Public Library; Benton Harbor, Michigan.
    • 28,000 square foot/two-story renovation and addition. A complete make-over of the facility, both building systems and functionality.
    • Role: Technical support, LEED specifications, some project management (project did not move forward).
    • Click here for a full profile of this project . . .
  • Defiance Public Library; Defiance, Ohio.
    • Phased renovation of a historic Carnegie library. All new MEP systems, new entry element, complete reconfiguration of interior spaces, restoration of historic interior elements.
    • Role: Technical support, specifications, construction administration, some project management.
  • Brown County Public Library; Green Bay, Wisconsin.
    • Skylight replacement project. First phase of a potentially multi-phased project. New skylight element, structural work, lighting and other incidental work.
    • Role: Project Manager; directed the project during design and construction documents phases.
    • Click here for an image from this project . . .

Residential | Institutional

  • CHA – Irene McCoy Gaines Senior Apartments; Chicago, Illinois
    • Complete building assessment for a 1960s, 17 story, 150 unit, concrete framed senior public housing project for the Chicago Housing Authority (CHA).
    • Role: Project Manager, led the assessment team, organized and edited the final report.
  • Thorncreek Senior Living; Thornton, Illinois.
    • Five story, wood framed construction over a concrete parking level, includes 46 units and a number of tenant amenities.
    • Role: Provided technical assistance to the project team during design and construction.
    • Click here for an image from this project . . .
  • Healthier Home, Chicago, Illinois
    • Development of a market rate, three to six unit ‘healthy and sustainable’ prototype housing development with a goal of being able to reproduce the model.
    • Role: Project Manager, directed the project (project never fully completed).
  • Grace Park Senior Housing; Schiller Park, Illinois
  • Saint Francis Monastery; Milwaukee, Wisconsin
    • Master Planning for 30,000 S.F. Monastery complex (1890’s), parish center and other adjacent parish structures to determine the future course of the complex.
    • Project Manager, directed the project and contributed to the design effort.
  • Deborah’s Place – Transitional Housing; Chicago, Illinois.
    • Renovation of a 30,000 S.F. (1890’s) convent into a single-room transitional housing, training and support facility for homeless women.
    • Project Manager; directed the project during bidding and construction phases.
    • Click here for a full profile of this project . . .
  • The New City – see Commercial – Mixed Use category (above).
  • DeKalb Mixed-Use – see Commercial – Mixed Use category (above).
  • Main and Osage Mixed-Use – see Commercial – Mixed Use category (above).
  • Lawrence Hall Youth Services – see Schools | Libraries | Civic category (above).

Medical | Clinical

  • Medical Office / Clinical Spaces, Northshore University Health Systems; Gurnee, Illinois
    • Build-out of three medical suites: primary care, radiology and cardiology in a new “core & shell” space – 26,600 square feet, LEED rated.
    • Role: Project Management of the construction operations (Architect: ESA).
    • Click here for a full profile of this project . . .
  • Medical Suites (2), Illinois Masonic Medical Center; Chicago, Illinois.
    • Build-out of two medical suites for a radiology center and psychiatric learning center – approximately 3,000 square feet.
    • Role: Project Manager from design development thru CD’s.
  • Health Center, University of Chicago – Friend Center; Chicago, Illinois.
    • Renovation of a portion of a 30,000 s.f., 1950’s children’s psychiatric campus into a full service health clinic (pediatrics, ob-gyn, x-ray, etc.).
    • Role: Assisted the project manager and directed portions of the design development and construction document phases of the project.
  • Medical Imaging Facilities.
    • Renovation and new construction of imaging facilities of varying sizes and complexity; free-standing clinics, medical suites, hospital and clinical spaces – both public and private contracts throughout the country (involved with over 30 projects).
    • Role: Contributed to various phases of the projects including Project Architect role; provided construction support for a number of later projects. Selected projects include:
      • Rhode Island Hospital Radiology; Providence, Rhode Island
      • Saint Vincent Hospital MRI Center; Manhattan, New York
      • Radiology Clinic; LaJolla, California
      • MRI Center; Meridian, Mississippi
      • Saint Margaret’s Hospital Radiology; Hammond, Indiana
      • Univ. of Illinois Hospital MRI Center; Chicago, Illinois
    • Click here for a full profile one of these projects . . .

Religious | Places of Worship

  • Community Christian Church; Naperville, Illinois.
    • Planning and design for a new phased, multi-purpose, worship and Christian Life Facility.
      • Master Planning Phase anticipating 80,000 – 100,000 S.F.
      • Phase I design and build-out; a 35,000 S.F., three level Multi-purpose Worship Facility featuring a gymnasium and coffee shop.
      • Phase II design and build-out; a 25,000 S.F., three level addition, features a stepped floor theatrical / classroom / presentation space.
    • Role: Project Manager, directed all projects and contributed to the design effort.
    • Click here for a full profile of this project . . .
  • North Shore Congregation Israel, Northbrook, Illinois
  • The Moody Church; Chicago, Illinois
  • Evangelical Covenant Church; Hinsdale, Illinois
    • Master Planning for a 25,000+ S.F. neighborhood Church Facility expansion; implementation of Phase I (12,000 S.F.) addition and renovation work.
    • Role: Project Manager, directed the project and contributed to the design effort.
    • Click here for a full profile of this project . . .
  • Grace Episcopal Church – see Preservation | Restoration category, below
  • Saint Andrew’s Episcopal Church; Downer’s Grove, Illinois
  • Hope Community Church – see Site | Planning | Development category (below).
  • Trinity Lutheran Church; Crown Point, Indiana
  • Coal City United Methodist Church; Coal City, Illinois
    • 12,000 S.F. frame/masonry Church; narthex, worship, social hall, and classrooms.
    • Role: Field Architect, completed the construction administration work.
  • Saint Michael the Archangel Parish; Schererville, Indiana.
    • 45,000 S.F. masonry Church; narthex, 1200 seat worship space, chapel, social hall support spaces – completed in two phases.
    • Role: Project Manager, directed the project from design development through construction.
    • Click here for a full profile of this project . . .
  • Holy Family Catholic Parish – Phase II; Inverness, Illinois.
    • 40,000 S.F. foot addition to a 1980’s church; social hall/gymnasium, commercial kitchen, large meeting rooms, classrooms and seminar rooms.
    • Role: Project Manager, directed the project from design development through construction.

Preservation | Restoration | Refurbishment

  • Irene McCoy Gaines Apartments – see Residential | Institutional category (above).
  • General Services Administration (GSA)
    • Assessment, renovation, repair and refurbishment work at various federal buildings in the Chicago area.
    • Role: Contributed to various phases of the projects including project management and construction support for a number them. Selected projects include:
      • Roof / Parapet Repair Project, Custom House.
      • Lead Abatement Assessment / Mitigation, Custom House.
      • Lower Level Concrete Repairs, 536 South Clark.
      • HVAC Blower Fan Replacement, Dirksen Courthouse.
      • Judges Shower and Toilet Room Renovations, Dirksen Courthouse.
      • Ceiling / MEP Replacement Work, Klusinski Building.
      • Roof / Parapet Assessment, Custom House.
      • Parking / Site Re-Work, Federal Archives and Records Center.
      • MEP improvements, Federal Archives and Records Center.
  • Historic Riverside Water Tower: Riverside, Illinois
    • Study of deteriorating masonry façade and coatings, and peeling roof coating; evaluation of prior restorations efforts that are failing and proposed solutions.
    • Role: Project Manager for the study phase.
  • The Wrigley Building; Chicago, Illinois
    • Renovation, restoration and refurbishment of the lower level facades, lobbies and plaza of the flagship building.
    • Role: Technical support to the design team for various portions of the project.
    • Click here for an image from this project . . .
  • Uptown Theater; Chicago, Illinois.
    • Building assessment for restoration, renovation and possible conversion to entertainment venue.
    • Role: Provided technical support to the partner-in-charge.
  • Woodstock Opera House; Woodstock, Illinois.
    • Building Addition and minor renovation to the 1880’s historic civic center and performance center (National Register of Historic Places).
    • Role: Project Manager, directed the project from design development through construction.
    • Click here for a full profile of this project . . .
  • Grace Episcopal Church; Oak Park, Illinois.
    • Interior masonry restoration and repair to this historic 1890’s gothic church.
    • Role: Project Manager, directed the project, completed the construction documents and construction administration phase.
    • Click here for an image of this project . . .
  • Ida B. Wells Housing “Historic Element;” Chicago, Illinois.
    • Design work to adapt historic public housing to market rate apartments.
    • Role: Project Manager, led the design effort and directed the project.
  • The Elks Memorial; Chicago, Illinois.
    • Restoration of the 1920’s Elks National Memorial (classical rotunda) building: exterior walls, plaza pavers, parapets, steel windows and roof systems.
    • Role: Contributed to portions of the project(s) including some project management.
  • Yondorf Hall; Chicago, Illinois.
    • Renovation and restoration of the 1890’s Yondorf Block Building (National Register of Historic Places).
    • Role: Contributed to portions of project(s); Project Architect for the “white box” renovation of the second and third floor auditorium space.
    • Click here for a full profile of this project . . .

Site | Planning | Development

  • 450 South Federal Plaza; Chicago Illinois
    • Redevelopment and restoration of the plaza adjacent to the Chicago Metropolitan Correctional Center. Work included replacing the lost trees, new flatwork materials, drainage and storm water management upgrades, and new landscaping.
    • Role: Technical assistance to the design team during the design and construction phases
    • Click here for an image from this project . . .
  • Hope Community Church; Oak Forest, Illinois
  • NorthBridge Plan; Chicago, Illinois

Small Scale Residential

  • Home Addition; Chicago, Illinois.
    • Addition and renovation of an owner occupied two unit home. Project included sustainable elements in the design (construction never completed).
    • Role: Architect of Record for the project; completed or directed all work.
    • Click here for an Image from this project . . .
  • CTS President’s House Renovation; Chicago, Illinois.
    • Gut renovation and addition to portions of the Chicago Theological Seminary President’s house.
    • Role: Project Manager during parts of the design and construction phases.
  • Home Addition/Renovation; Chicago, Illinois.
    • Renovation and addition (600 square foot) to an 1890’s two-story Victorian home. Addition included new kitchen/breakfast area and new master bedroom suite.
    • Role: Architect of Record for the project; completed all work.
    • Click here for a full profile of this project . . .
  • Malato Apartment Renovation; Chicago, Illinois.
    • Renovation of a six-flat, walk-up apartment building into six new apartments (a one bedroom garden unit, 4 – two bedroom units and a three bedroom duplexed unit).
    • Role: Architect of Record for the project; completed or directed all work.
  • Gabriel Place Condominiums; Chicago, Illinois.
    • Renovation of a six-flat, walk-up apartment building into six condominiums (4 – two bedroom units and 2 – two bedroom duplexed units).
    • Role: Architect of Record for the project; completed all work.
  • Silverman Coach House Renovation; Chicago, Illinois.
    • Renovation of a 1,000 square foot coach house; included new kitchen, stair to second floor and fireplace – complete reorganization of space.
    • Role: Architect for the project; completed all work.
    • Click here for an image from this project . . .
  • Miscellaneous residential projects in Milwaukee and Chicago.
    • Role: Architect or Designer for the projects (role/scope of work varied). Selected projects include:
      • Home addition, Riverside, Illinois (un-built)
      • Front stoop / railing renovation, Riverside, Illinois
      • Kitchen renovation, Riverside, Illinois
      • Attic build-out, Riverside, Illinois (un-built)
      • Home addition, Mequon, Wisconsin
      • Garage with loft, Oak Park, Illinois
      • Façade renovations, Winnetka, Illinois
      • Home renovation, Lakeview/Chicago, Illinois
      • Kitchen renovation, Chicago, Illinois
      • Small home addition, Brookfield, Wisconsin